|
CompuNOx |
Burner Management |
Combustion Control |
Catalyst Control |
|
CondiMax |
PreMizer |
η-Max |
Economizers |
|
SCR |
FGR |
|
CEMS |
CompuNOx PLC |
η-Max Simu |
Plant HMI |
BoilerModel |
|
|
|
|
Heat Recovery Systems |
CondiMax -- Condensing Economizers
The CondiMax condensing heat exchanger will provide the highest heat recovery possible. Being able to extract virtually all waste heat out of the boiler stack provides a stack temperature of less than 100 deg F and an efficiency of greater than 94%. |
PreMizer -- Combustion Air Preheating
A heat recovery solution for processes with high condensate return for unexpectedly high efficiencies. |
η-Max -- Parasitic Load Minimization
This solution is the right tool to establish the optimal distribution of heat recovery to minimize parasitic losses. Small changes in heat recovery design will provide immense cost savings |
Standard Economizer
The mere existence of an economizer does not guarantee the optimal use of it. It is essential to monitor the performance of existing economizers to establish a cost/savings figure for better economizer performance. When installing a new economizer we establish the correct size for optimal heat recovery for all operational loads to capture the maximum potential of an economizer installation. |
|
|
Attention Plant Managers:
Realize the potential of your system to improve stability, meet emission standards and substantially increase efficiency.
Submit Benz Air boiler questionnaire to get information about the potential of your system.
--->Download Questionnaire
Email questionnaire to:
info@benzair.com |
|