Steam Efficiency
      Robert Benz, P.E. 11.08

        Energy Efficiency in the steam
        industry has been long overlooked
        and often believed to be impossible.
        Engineers have followed the
        befief that boilers need to run at
        full load 24 hrs a day.
        continued here

      Data Aquisition
      and Plant Efficiency
      Patricia Spiritus,
      General Manager 11.08

        Data Aquisition is the key to
        getting the most out of both your
        power plant and your energy dollar
        continued here

      Evaluating a Successful
      Installation
      Marcel Staedter

        Clients come to us for a variety of
        reasons. Some are looking to lower
        their CO2 emissions, some are looking
        continued here 

 

Engineering Steam Efficiency

Benz Air Engineering delivers engineering solutions that optimize efficiency and minimize emissions for industrial, utility and district energy and steam generation facilities.

We start by evaluating your current system and provide recommendations based on a comprehensive analysis that includes anticipated efficiency, emission reduction, cost savings, and payback. Many solutions qualify for rebates, including up to 50 percent of the installation cost.

Benz Air Engineering Delivers The Most Efficient Systems In The World.

In addition to meeting the definition of best available technology, Benz Air Engineering successfully exceeds all federal emission guidelines by upgrading select components along with any retrofit and installation. This is the only approach that has consistently delivered the best return on investment for more than 200 installations worldwide.

        current installs        success stories

                                                                                           Benz Air Super Boiler
                                                                                           Pacific Coast Producers (Woodland, Calif.)
                                                                                           Installation: SCR-Efficiency Retrofit, Burner
                                                                                           Replacement, Pre-Mizer,
                                                                                           EtaMax, and DA Control System

                                                                                           Benz Air Increased efficiency by greater than
                                                                                           94 percent, benefited from an 80-to-1 turndown,
                                                                                           reduced CO2 by 2,200 metric tonne,
                                                                                           estimated annual savings of $280,000 per year,
                                                                                           estimated $310,000 In rebates, and earned
                                                                                           payback in less than two years.