      Steam Efficiency
      Robert Benz, P.E. 11.08

        Energy Efficiency in the steam
        industry has been long overlooked
        and often believed to be impossible.
        Engineers have followed the
        befief that boilers need to run at
        full load 24 hrs a day.
        continued here

      Data Aquisition
      and Plant Efficiency
      Patricia Spiritus,
      General Manager 11.08

        Data Aquisition is the key to
        getting the most out of both your
        power plant and your energy dollar
       continued here

      Evaluating a Successful
      Installation
      Marcel Staedter

        Clients come to us for a variety of
        reasons. Some are looking to lower
        their CO2 emissions, some are looking
       continued here

data1

The Champion HI-E Burner
_________________________________________________

In response to the inability of the "burner companies" to provide a stable and efficient burner, Benz Air Engineering has developed the Champion HI-E burner. The burner combines the attributes of the proven burners to provide the most efficient combustion system possible. Combined with the CondiMax Condensing Heat Recovery System or the PreMizer, Preheating system, the burner offers the most efficient and flexible solution to achieve low NOx emissions with a high rate of return.

  • For gas- or oil-fired boilers with heat inputs from 30 to 450 MMBtu/hr per burner.
  • Advanced rapid mix air-fuel combustionand FGR for cost-efficient low-NOx performance.
  • Increased flexibility with turndown ratio exceeding 20 to one.
  • Excess stack oxyen less than 1.5% at firing rates above 25%.
  • Stable combustion with NOx emission less than 25ppm.
  • Simple installation with minimal modfication of windbox.
  • Ramp rates from 5% to 100% within 90 seconds.

Combined with the Benz Air CataMizer, the HI-E Burner provides less than 3ppm NOx Compliance

Contact us for more information:

customerservice@benzaireng.com

Pacific Coast Producers, Woodland CA

  • 200mmbtu/hour
  • <5ppm NOx
  • 3% to 100% ramp rate in less than 90 seconds
  • >87% efficiency
  • Simple payback within 1 year.